Bring isolation design into your permit-to-work workflow

IsoBuilder complements IntelliPERMIT by preparing drawing-linked isolation information before permit-to-work execution.

Build isolations from the P&ID, keep the approved boundary visible, and give permit teams cleaner LOTO and lockout/tagout context for mining, oil and gas, and heavy industry work.

Drawing-linked isolation scope

Keep the isolation boundary, assets, and drawing revision connected before the permit is prepared.

Cleaner permit handover

Give permit teams structured isolation details instead of relying on disconnected markups, spreadsheets, and screenshots.

Controlled change visibility

See when drawing or scope changes affect an isolation, so the handover can be reviewed before field execution.